Calibrations of instrumented steam separators to determine quality and flow distribution in an operating steam generator /
Guardado en:
Autor principal: | Teigen, B. C. |
---|---|
Otros Autores: | Sodergren, J. H., Electric Power Research Institute. |
Formato: | Libro |
Lenguaje: | |
Publicado: |
Palo Alto, Calf. :
Electric Power Research Institute,
1983.
|
Colección: | EPRI. Final Report ;
NP 2805 RP S 139-1 (Jan. 1983) |
Ejemplares similares
-
Two-phase steam flow in turbines and separators : theory, instrumentation, engineering /
Publicado: (c1976.) -
Steam its generation and use
por: Babcock-Wilcox.
Publicado: (c1922.) -
Numerical methods for thermally expandable two-phase flow-computational techniques for steam generator modeling /
por: Hall, C. A.
Publicado: (1980.) -
Simplified models for transient analysis of nuclear steam generators /
por: Lee, J. C.
Publicado: (1981.) -
PWR steam generator cost benefit methodology : denting /
por: Rice, T. R.
Publicado: (1982.)