|
|
|
|
LEADER |
00955nam#a2200313#a#4500 |
001 |
OEOCON001710 |
003 |
OEO |
005 |
20170331153641 |
008 |
941129s1968 mx |||| ||||||||| ||spa d |
040 |
# |
# |
|a OEO
|b spa
|c OEO
|
080 |
# |
# |
|a 658.5.01
|
092 |
# |
# |
|c 658.5.01 C737 ej.1
|
100 |
0 |
# |
|a Companys Pascual, Ramón
|
245 |
1 |
0 |
|a Planificación de proyectos :
|b métodos PERT-ROY-CPM y derivados.
|
250 |
# |
# |
|a 1a. ed.
|
260 |
# |
# |
|a México :
|b Limusa-Wiley,
|c 1968.
|
300 |
# |
# |
|a 103 p. :
|b diagr. ;
|c 27 cm.
|
500 |
# |
# |
|a Bibliografía: p. 101-103
|
653 |
# |
# |
|a ordenación
|
653 |
# |
# |
|a ligaduras
|
653 |
# |
# |
|a programación
|
653 |
# |
# |
|a control
|
653 |
# |
# |
|a camino crítico
|
907 |
# |
# |
|a Monograf
|
952 |
# |
# |
|f C
|g $ 0,01
|p OEO22116
|t ej.1
|a OEO
|b OEO
|o 658.5.01 C737 EJ.1
|5 2
|y IMP
|w 19941129
|
952 |
# |
# |
|f C
|g $ 0,01
|p OEO23655
|t ej.2
|a OEO
|b OEO
|o 658.5.01 C737 EJ.2
|y IMP
|w 19941129
|
988 |
# |
# |
|a sibunc
|l 1
|k 22.116
|o 1
|m 22315
|
989 |
# |
# |
|a oresisb
|
999 |
# |
# |
|a López
|