|
|
|
|
LEADER |
00937nam#a2200313#a#4500 |
001 |
OEOCON001775 |
003 |
OEO |
005 |
20170331153641 |
008 |
950426s1973 ag |||| ||||||||| ||spa d |
040 |
# |
# |
|a OEO
|b spa
|c OEO
|
080 |
# |
# |
|a 658.5.01(048)
|
092 |
# |
# |
|c 658.5.01(048) B178
|
100 |
0 |
# |
|a Baldoni, Miguel Angel
|
245 |
1 |
0 |
|a Programación y control de la producción y control de stocks.
|
260 |
# |
# |
|a Mendoza,
|c 1973.
|
300 |
# |
# |
|a ii, 46 h. ;
|c 29 cm.
|
500 |
# |
# |
|a Bibliografía: h. 45-46
|
591 |
# |
# |
|a Seminario -
|d UNCu. Facultad de Ciencias Económicas.
|
653 |
# |
# |
|a planificación
|
653 |
# |
# |
|a gráficos de Gantt
|
653 |
# |
# |
|a PERT
|
653 |
# |
# |
|a CPM
|
653 |
# |
# |
|a camino crítico
|
700 |
0 |
# |
|a Muñoz, Carlos,
|d 1943- ,
|e director
|
907 |
# |
# |
|a MONOGRAF
|
952 |
# |
# |
|f O
|g $ 0,01
|p OEO34105
|t ej.1
|a OEO
|b OEO
|o 658.5.01(048) B178
|5 2
|y IMP
|w 19950426
|
988 |
# |
# |
|a sibunc
|l 1
|k 34.105
|o 1
|m 22424
|
989 |
# |
# |
|a oresisb
|
999 |
# |
# |
|a López
|